FMG – Cloudbreak

Project Type: Biggie Saline

Scope:
  • Installation of HDPE Pipeline consisting of 7,000m of DN630 HDPE Pipe
  • Installation of 48 Pipe Burials
  • Flushing, Hydrostatic Testing, Commissioning of Piping Infrastructure
Key Equipment:
  • Earth Moving Equipment:
    • 40t Moxy Dump Truck
    • D8 Bulldozer
    • 24t Excavator
    • 33t Excavator
    • L90 Loader
    • Z80 Loader
    • Z70 Loader
    • 12m Grader
    • Skid Steers
  • Heavy Vehicles:
    • Various Light Vehicles
    • 6×4 Tippers
    • Service Trucks
    • Water Carts
    • 20t Franna
    • Canter Crew Truck
  • Welding Equipment:
    • McElroy T900 Welders
    • Veitz VFT900 Welder
  • Ancillary Equipment:
    • Office Blocks
    • Crib Rooms
    • Toilet Blocks
    • Water Tanks
    • Genset – General 6KVA
    • Genset – Dixon 12.5KVA
    • Genset – Back up 13KVA