BHP – South Flank

Project Type: Assembly and Installation of Above Ground Valve Stations

Scope:
  • Assembly, Installation & testing including of carbon Steel Piping for above ground valve stations
Key Equipment:
  • Volvo L90 Loader
  • 20tn Franna Crane
  • Hydro Testing Equipment